We’ve been tweaking the reservation system for the past few months, and we’re now ready to go live!  We also wanted to be close enough to a reliable launch date and have all of our business requirements in place.  Take a look!

 

Reserve your spot today!

The team also got most of the railings and micro-inverters in place for the solar panel installation for the upper 1BR and the two poolside villas.

IMG_7730

Panels this week!

IMG_7736

To be blunt, this week was not a “sexy” week.  Steps being formed for pool access from the villas.

IMG_7749

IMG_7748

Final waste treatment system in place, plus a little spot for a surprise.IMG_7746

The pool area received some plaster and fine tuning on the raw concrete to make sure the surfaces are plumb and pitched for tile installation.

IMG_7744

Footers for the retaining wall for the upper roadway.
IMG_7738

Stripping the forming from the spa area and backfilling.

IMG_7739

Some final grading around the pool area.

IMG_7740

Plastering on the Southern end of the pool complex.

IMG_7743

And your weekly Cami update!  Shes trying to wear Lori’s slides.

FullSizeRender_3FullSizeRender_1FullSizeRender

That hair at the end of the afternoon is a sign of a great day.  Have a great week everyone!  Make your reservation today!